LPG import main terminal and several distribution plants

PROJECT DETAILS

We provide services to OMERA LPG from 2012 until today for the construction of one main terminal in Mongla and several storage and bottling plants to cover all the country with LPG storage, distribution and filling facilities.

GENERAL

  • Period : 2012 – 2024
  • Situation : Mongla, Dhaka, Chittagong, Bogra – Bangladesh
  • Customer : OMERA LPG Ltd

SERVICES

EPC contracts for construction of one main import terminal and three satellite bottling plants including 4 phases of extension (increasing of LPG storage capacity, integration of propane storage and network  increasing of the filling hall capacity, storage management system, etc.)

DESCRIPTION

  • Two initial LPG storage spheres of 4200 m³ (2014) and two additional LPG storage spheres of 4000 m³ (2019 & 2023)
  • Two propane storage spheres of 3000 m³ (2018)
  • LPG storage bullet tanks of 127 m³ (2014), 100m³ (2017) and 120m³ (2019)
  • Propane storage bullet tanks 120 m³ (2019)
  • Cylinder bottling facilities (2014 & 2018)
  • Ship unloading jetty facilities and truck unloading / loading posts
  • All necessary utilities (fire-fighting system, compressed air network, electricity, SCADA)