LPG filter and metering skid

PROJECT DETAILS

We built a skid for LPG counting and filtering to be installed at end of LPG import pipeline feeding an LPG storage terminal. The skid was composed of two modules.

GENERAL

  • Period : 2018
  • Situation : confidential
  • Customer : confidential

SERVICES

The contract included design, supply of equipment, assembly at factory, test a factory, transport and commissioning at the final location.

DESCRIPTION

  • One module for counting, with mass flowmeter, regulation valve, instrument and other.
  • One module for filtering, with two filtering levels, pressure control and other accessories.
  • Electrical panel with PLC and supervision screen