LPG filter and metering skid
PROJECT DETAILS
We built a skid for LPG counting and filtering to be installed at end of LPG import pipeline feeding an LPG storage terminal. The skid was composed of two modules.
GENERAL
- Period : 2018
- Situation : confidential
- Customer : confidential
SERVICES
The contract included design, supply of equipment, assembly at factory, test a factory, transport and commissioning at the final location.
DESCRIPTION
- One module for counting, with mass flowmeter, regulation valve, instrument and other.
- One module for filtering, with two filtering levels, pressure control and other accessories.
- Electrical panel with PLC and supervision screen